• Projects
  • Services
  • About
  • NEWS
  • Experience
  • Contact
Pillar Design Studios

WORLDS LEADING ACTION SPORTS DESIGN / BUILD FIRM

  • Projects
  • Services
  • About
  • NEWS
  • Experience
  • Contact

ANTHEM ACTION SPORTS COMPLEX

Anthem is now home to a new all wheel friendly action park!

The new complex includes:
* Newly Renovated Skatepark - The old park was 16 years old. A few changes were made (new elements added/some old elements removed) to provide a better overall flow to the Skatepark. We also fixed cracks, resealed concrete and repainted all steel.


* Competition Olympic Style Street Course - By using an unused roller hockey rink, we were able to provide cost saving benefits.


* Pump Park - The new pump park, is our take on a traditional pumptrack but this style is more universal - for all wheels, instead of focusing solely on one user type. It is also built out of concrete instead of the traditional asphalt, providing lower maintenance and a longer life span.

We couldn't be happier with the outcome. This new facility is a perfect fit to the Anthem community and could not have come at a better time. The Olympics have really shed a light onto existing Skatepark conditions and the need for upgrades, renovations and quality Skateparks for future olympians to train at.

The Anthem Action Sports Complex is a family facility, having everything a community needs in one location. The parks includes: shade structures, water fountains, spectator seating and landscaping. This will surely be a destination park that will draw people from not only Arizona but all over the US and the World.

ANTHEM ACTION SPORTS COMPLEX
Tuesday 03.08.22
Posted by Brad Siedlecki
 

SKATEPARK CONSTRUCTION

Quincy Skatepark is complete! The City of Quincy had an existing pre-fab park that needed to be updated. The new design offers more skate elements, while utilizing open space and creating a diverse park. Providing something unlike any other Skatepark in the greater Boston area.

2020-07-09 06.23.15.jpg 2020-07-07 15.41.33.jpg 2020-07-08 11.07.55.jpg 2020-06-10 12.49.31.jpg 2020-05-28 13.12.48.jpg 2020-05-14 11.59.43.jpg
“Not only is the Quincy Skatepark a major upgrade from the prior skatepark, but we believe it will also provide inspiration to surrounding communities who are toying with the idea of building a skatepark to jump on the bandwagon. 

Thank you Pillar Skateparks and Artisan Skateparks for delivering such a beautiful park that will benefit generations to come.”
— Jeff Burke - Lead Skatepark Advocate

Quincy Skatepark is located in Quincy, MA.

tags: #maskateparks, #pillarskateparks #designbidbuild #artisanskateparks #fundraising #skateadvocates
categories: MAskateparks, Pillarskateparks
Tuesday 08.04.20
Posted by Brad Siedlecki
 

SKATEPARK CONSTRUCTION

Rosemount, MN will soon be home to a new Skatepark. The construction crew has been hard at work and the park should be completed by summers end. We hope to be on-site in September for the grand opening. Props to the City of Rosemount for seeing a need and pushing forward with the project during these uncertain times. Stay tuned for construction completion and grand opening updates.

2020-06-25 07.43.47.jpg
2020-07-05 07.54.38.png
IMG_0530.jpg
2020-07-15 19.42.55-1-2.jpg
2020-07-22 14.03.05.jpg
2020-07-05 12.37.05.png
2020-07-22 14.03.47.jpg
2020-07-22 14.04.04.jpg
tags: #skateparks, #pillarskateparks
categories: MNSkateparks, Pillarskateparks
Friday 07.31.20
Posted by Brad Siedlecki
 

SKATEPARK CONSTRUCTION

Brevard North Carolina will soon be home to a new concrete Skatepark.

Phase 1 is set to begin, stay tuned for updates.

73152848_3419483934762880_3141688139456851008_o.jpg
tags: #skateparks, #skateadvocates, #ncskateparks, #artisanskateparks, #designbuild
categories: NCSkateparks, Pillarskateparks
Monday 07.06.20
Posted by Nicole Licari Robertson
 

SKATEPARK DESIGN

Construction has been APPROVED! The Hart Family Memorial Skatepark, the first concrete skatepark in the Lakes Region, is officially coming to Meredith, New Hampshire this summer. Four years ago Brendan Hart began campaigning to rebuild the Skatepark, which was a beloved facility that was built in the memory of his late father. After the sudden passing of his mom who was also the skatepark’s biggest advocate, this special recreational space will be named the Hart Family Memorial Skatepark.

We are honored to be apart of this exceptional project and supportive community.

HFMSk8Park Overview 1.jpg
HFMSk8Park Overview 2.jpg
HFMSk8Park Overview 3.jpg
HFMSk8Park Overview 4.jpg
HFMSk8Park view 1.jpg
HFMSk8Park view 2.jpg
HFMSk8Park view 3.jpg
HFMSk8Park view 4.jpg
HFMSk8Park view 5.jpg
tags: #skateparks, #NHskateparks, #hartfamilyskatepark, #pillarskateparks, #artisanskateparks, #designbuild, #designbuildskateparks, #skateadvocates, #tonyhawkfoundation
categories: Skateparkdesigner, NH Skateparks
Wednesday 07.01.20
Posted by Nicole Licari Robertson
 

SKATEPARK CONSTRUCTION

Quincy construction has begun and the Artisan crew has wasted no time. With concrete work beginning this week, construction is likely to be completed by July. This soon to be 10,000 sq.ft. custom Skatepark is an upgrade from their original above-ground park. By working with the City and implementing in-kind donations, we were able to meet the tight budget provided.

quincy original skatepark .jpg

the original park

 
Quincy Skatepark Rendering 121018.jpg
tags: #skateparks, #maskateparks, #designbuild, #skateparkupgrade, #pillarskateparks, #artisanskateparks, #pillardesignstudios
categories: MAskateparks, skatepark builder, skatepark design build
Friday 05.22.20
Posted by Brad Siedlecki
 

SKATEPARK DESIGN

February we will be back on the East coast for two public input meetings. Spread the word and join us.

Feb. 4th at 5pm in South Portland, ME and Feb. 5th at 6:30pm in Worcester, MA.

See below for more details.

S. Portland Skatepark Meeting 2 Flyer 2.jpg
Meeting #2 Flyer.jpg
Friday 01.17.20
Posted by Brad Siedlecki
 

SKATEPARK DESIGN

Another exciting project is in the works. We are working with the Southern Ute Indian Tribe to create an Action Sports Complex. The design meeting to shape the masterplan is December 3rd! Stay tuned for concepts - the project includes a Skatepark, pumptrack, skate-able sidewalks and so much more.

SUIT Public Meeting 2 6.jpg
categories: actionsports skateparks, #coloradoskateparks
Thursday 11.21.19
Posted by Brad Siedlecki
 

SKATEPARK GRAND OPENING

New concrete has arrived in Iowa! Le Mars Skatepark has officially opened. 

2019-09-16 09.45.34.jpg

The grand opening was just last week and proved to be a record turn out at O'Toole Park. Several hundred people gathered to witness extreme sports at the Le Mars Skatepark. The free event brought professional skateboards from out of state and even Europe to demonstrate their skills, as well as a BMX team from Nebraska. Solidifying Le Mars is becoming a destination City.

“When I look at how many children, teens and adults are in and around the park since its completion, it is very clear that a ‘quality of life’ goal was definitely reached. The foundation hopes for similar results for all the projects we support.”  ”
— Mike Donlin, Le Mars Area Betterment Foundation President, - Quoted by LeMars Daily Sentinel (Kim Fickett, 2019), Skate Park is the newest attraction striving to help Le Mars reach destination status. 
2019-08-20 16.38.50.jpg

Showing homage to the Ice Cream Capital of the world, the design includes a halfpipe mimicking an ice cream scoop, which has been lovingly labeled as "the spoon" by the locals.

grandopening bmx.jpg
grandopening2.jpg
Lemarsgrandopening kelm1410 2 .jpg
LeMars Grand Opening KLEM 1410.jpg

PHOTO CREDIT: KLEM1410.COM

tags: #skateparks, #iowaskateparks, #designbuild, #midwestskateparks, #pillarskateparks, #pillardesignstudios
categories: Iowaskateparks
Wednesday 10.09.19
Posted by Brad Siedlecki
 

SKATEPARK DESIGN

We are happy to have been selected as the Skatepark designer for the South Portland Skatepark. We will be on-site this week to check out the possible locations and meet with the community and skateboarders. We hope to see you there.

S Portland Meeting #1 Flyer.jpg
tags: skatepark designer, #skateparks, #pillarskateparks, #publicinput, #designmeeting
categories: MAskateparks, Skateparkdesigner
Monday 09.30.19
Posted by Brad Siedlecki
 

SKATEPARK DESIGN

We are excited to begin the design process in Rosemount, MN. Mark your calendars and spread the word we want to see you there.

Rosemount Skatepark Design Workshop Flyer (1).jpg
tags: #skateparks, #pillarskateparks, #designmeeting, #skaterinput
categories: MNSkateparks
Wednesday 08.14.19
Posted by Brad Siedlecki
 

SKATEPARK GRAND OPENING

Flora Park Skatepark in Dubuque, IA is open and ready for the public. Fourteen years in the making this was an effort of love lead by a dedicated group of individuals at Kids in Dubuque Skate and supported by the City of Dubuque.

A ribbon-cutting celebration is scheduled for 5:30 p.m. on Thursday, Aug. 29. The event is being planned in coordination with Kids in Dubuque Skate and will acknowledge the volunteers and donors who supported the project. Get out and Skate.

67468085_2602571826442837_3015168879761555456_o.jpg
67566952_2602571886442831_8412468540489072640_o.jpg
67722357_2602572099776143_4312681957331828736_o.jpg
67568754_2602571946442825_7728895950978023424_o.jpg
tags: #pillarskateparks #designbidbuild #artisanskateparks #fundraising #skateadvocates
categories: Iowaskateparks, actionsports skateparks
Friday 08.09.19
Posted by Brad Siedlecki
 

SKATEPARK GRAND OPENING

Pleasanton Skatepark is complete with Texan accents, the park is open and ready to ride.

2019-07-02 11.59.53.png
2019-01-24 15.25.44.jpg
2019-02-01 15.24.36.jpg
53674788_3398606213583431_1219455375565127680_o.jpg
53369437_3398606920250027_2593427375039447040_o.jpg
tags: #texasskateparks, #skateparks, #designbuild, #skateparkdesign, #skateparkconstruction, #lonestarskatepark
categories: skatepark design build, skatepark construction, skatepark builder, Skateparkdesigner, TexasSkateparks
Wednesday 08.07.19
Posted by Brad Siedlecki
 

SKATEPARK OPENING

The City Owosso, MI contacted us to see what could be done with their budget of +/- $100,000. After working together and including in-kind donations we were able to provide them with this 3,000 sq. ft. custom concrete Skatepark.

Construction is complete and the park is open. The City will be planting grass soon.

Construction is complete and the park is open. The City will be planting grass soon.

DSC_3915.JPG DSC_3913.JPG DSC_3920.JPG

Since the moment the park was open it has been full of Skaters. If you build it, they will come.

No matter the size and or budget, concrete is always possible. Congratulations Owosso!

tags: #skateparks #designbuild #midwestskateparks #pillarskateparks #artisanskateparks #
categories: skatepark construction, skatepark design build, Skateparkdesigner, MISkateparks
Monday 07.01.19
Posted by Nicole Licari Robertson
 

SKATEPARK DESIGN

Jones Skatepark is a perfect example of what can be done for under 150K. No matter the size and or budget it is possible, do not settle for less than custom, poured-in-place concrete. Stay tuned for construction updates.

tags: #skateparks, #skateparkdesign, #midwestskateparks, #skateadvocates
categories: Skateparkdesigner
Tuesday 04.16.19
Posted by Brad Siedlecki
 

DESIGN

Atchison final design is complete, now it is time for fundraising, #pillarskateparks #skateparkfunding

The bowl in blue is phase 2, if funding allows.

The bowl in blue is phase 2, if funding allows.

future skatepark view 11.jpg
future skatepark overview 14.jpg
tags: skatepark designer, skateparks
categories: actionsports skateparks, Skateparkdesigner, skatepark design build
Wednesday 02.27.19
Posted by Brad Siedlecki
 

GRAND OPENING

Barbados Skatepark grand opening has been set. Mark your calendars and get your tickets, we will be in Barbados May 11th. Stay tuned for more details regarding the event and festivities.

The 60,000 sq. ft. state of the art facility includes a 13,000 sq. ft. Skatepark, restrooms, Skate shop, snack bar spectator viewing areas and lighting all located in the Olympic Centre at Garfield Sobers Sports Complex.

The 60,000 sq. ft. state of the art facility includes a 13,000 sq. ft. Skatepark, restrooms, Skate shop, snack bar spectator viewing areas and lighting all located in the Olympic Centre at Garfield Sobers Sports Complex.

2019-02-05 16.14.07 copy.jpg
2019-02-05 16.06.31 copy.jpg
2019-02-05 16.08.02 copy.jpg
2019-02-05 16.10.32 copy.jpg
tags: #skateparks, #designbuild, #artisanskateparks, #skateboardingintheolypmics, #skateparkconstruction
categories: actionsports skateparks, Skateparkdesigner, skatepark design build, skatepark construction, skatepark builder, olympicskatepark
Thursday 02.21.19
Posted by Brad Siedlecki
 

SKATEPARK CONSTRUCTION

Pleasanton Texas Skatepark is nearing completion, the Artisan crew will be wrapping up construction this month. Stay tuned for grand opening details.

2019-02-07 14.23.15.jpg
2019-02-12 14.23.22.jpg
2019-02-09 10.12.02.jpg
tags: #designbuild, #skateparks, #pillarskateparks, #artisanskateparks
categories: actionsports skateparks, skatepark design build, skatepark construction, skatepark builder
Wednesday 02.13.19
Posted by Brad Siedlecki
 

2018 RECAP

Pillar Design Studios would like to thank all those that we worked with and those that supported us throughout 2018! We look forward to working with all our new partners and building some epic parks in 2019!

Skatepark design build company 2018 year in review

Friday 12.28.18
Posted by Brad Siedlecki
 

MERRY CHRISTMAS AND HAPPY NEW YEAR

From all of us at Pillar, we wish you a safe and Happy Holiday.Our office will be closed from December 24th through January 1st.

From all of us at Pillar, we wish you a safe and Happy Holiday.

Our office will be closed from December 24th through January 1st.

Friday 12.21.18
Posted by Brad Siedlecki
 
Newer / Older

Powered by Squarespace.